EnergyIlha Solteira and Jupiá hydropower plants – CTG Brasil
Instrumentation automation project for the Ilha Solteira hydropower plant.
Automation of 265 monitoring instruments at the dams of the Tucuruí, Itumbiara, Paulo Afonso I, II and III and São Domingos hydropower plants.

Automation of 265 monitoring instruments at the Tucuruí (PA), Itumbiara (MG/GO), Paulo Afonso I, II and III (BA) and São Domingos (MS) hydropower plants, covering piezometers, water level, displacement, flow and temperature meters, and pendulums.
Supply of 111 vibrating wire piezometers, 194 displacement meters, 10 pendulums and 39 ultrasonic sensors. The system comprises 87 Worldsensing dataloggers, wireless communication, a solar-powered repeater at Itumbiara and Campbell dataloggers and multiplexers in the galleries, with the data integrated into the SYSDAM software.
EnergyInstrumentation automation project for the Ilha Solteira hydropower plant.
MiningGeotechnical instrumentation, automated readings and solar power supply for monitoring two dams and a stockpile.
EnergySupply and installation of geotechnical instrumentation for monitoring LIGHT’s dams.
Infrastructure instruments for the energy, transmission, mining and transport sectors. Tell us what your project needs to monitor.