EnergyIlha Solteira and Jupiá hydropower plants – CTG Brasil
Instrumentation automation project for the Ilha Solteira hydropower plant.
Automation of 371 monitoring instruments at eight CTG Brasil hydropower plants.

Automation of 371 monitoring instruments at eight CTG Brasil plants: Canoas I, Canoas II, Jurumirim, Chavantes, Capivara, Taquaruçu, Rosana and Garibaldi, including piezometers, flow and water level meters, extensometers and triorthogonal meters.
Installation of GEOKON sensors, about 150 Worldsensing dataloggers, 11 gateways, GEOKON multiplexers and Campbell concentrators, integrated with the SYSDAM platform. The work covered the site survey, installation, integration, assisted operation, technical reports and as-built documentation.
EnergyInstrumentation automation project for the Ilha Solteira hydropower plant.
MiningGeotechnical instrumentation, automated readings and solar power supply for monitoring two dams and a stockpile.
EnergySupply and installation of geotechnical instrumentation for monitoring LIGHT’s dams.
Infrastructure instruments for the energy, transmission, mining and transport sectors. Tell us what your project needs to monitor.