EnergyIlha Solteira and Jupiá hydropower plants – CTG Brasil
Instrumentation automation project for the Ilha Solteira hydropower plant.
Online monitoring of the shield passing beneath Paulista station, with continuous readings during excavation.

Online monitoring of the shield passing through Paulista station on Line 4 of the Sao Paulo Metro.
Tunnel boring beneath a dense urban area demands continuous readings: the system tracks settlement and displacement of surface structures as the machine advances, with data available in real time to whoever decides to stop or carry on.
EnergyInstrumentation automation project for the Ilha Solteira hydropower plant.
MiningGeotechnical instrumentation, automated readings and solar power supply for monitoring two dams and a stockpile.
EnergySupply and installation of geotechnical instrumentation for monitoring LIGHT’s dams.
Infrastructure instruments for the energy, transmission, mining and transport sectors. Tell us what your project needs to monitor.