EnergyIlha Solteira and Jupiá hydropower plants – CTG Brasil
Instrumentation automation project for the Ilha Solteira hydropower plant.
Two geotechnical monitoring systems at the ponds and SEPs of the Uberaba unit: 145 instruments and 13 gateways.

Deployment of a geotechnical monitoring system at Ponds A, B and C and SEP 1, 2 and 2A of the Mosaic Fertilizantes unit in Uberaba (MG), totaling 105 instruments and 5 gateways.
On the same structures, deployment of a tiltmeter monitoring system, totaling 40 instruments and 8 gateways.


EnergyInstrumentation automation project for the Ilha Solteira hydropower plant.
MiningGeotechnical instrumentation, automated readings and solar power supply for monitoring two dams and a stockpile.
EnergySupply and installation of geotechnical instrumentation for monitoring LIGHT’s dams.