Skip to content
Energy

Governador Parigot de Souza hydropower plant – COPEL

Installation and automation of piezometers, water level meters and a flow meter to modernize the civil instrumentation of the GPS hydropower plant.

Location
Campina Grande do Sul, PR, Brazil
Category
Energy
Client
COPEL
Aerial view of the reservoir and the earth dam of the Governador Parigot de Souza hydropower plant, among forested hills.
Image source: Turismo Itaipu

Modernization of the civil instrumentation of the earth dam and the spillway, with 347 m of rotary drilling in 19 boreholes, installation of 13 Casagrande piezometers and 6 water level meters, and automation of the existing flow meter.

Integration of GEOKON vibrating wire sensors, keeping manual readings possible, an ultrasonic sensor and 12 Worldsensing dataloggers, transmitting over a LoRa network to a gateway, with surge protection.

We operate across Brazil and abroad

Infrastructure instruments for the energy, transmission, mining and transport sectors. Tell us what your project needs to monitor.

Request a quote